Four-lane expansion of Highway 69, over 6.8 km, northerly from 4.2 km south of Highway 124, 12 new bridge structures, including structures over the Seguin River, 2 bridge rehabilitations, and 2 new interchanges at Parry Sound Drive and at Highway 124.
Key Elements:
Grading, drainage for new highway over 6.8km
Rock excavation (1,000,000 m3), earth and muskeg excavation (400,000 m3)