Four-lane expansion of Highway 11, over 8.2 km, northerly from 0-7 km south of the Stong/Machar Twp Boundary Road to 4.9 km north of the Town of South River, including 7 new structures and 2 new interchanges at Boundary Road and north entrance to South River.
Key Elements:
Grading, drainage, electrical for 8.2 km new highway
Earth and muskeg excavation (1,500,000 m3), rock excavation (1,00,000 m3) and aggregate placement(600,000 t)