|
Other examples of the wide range of projects completed by Bot Construction include:
- Expansion of Highway 417 East Ottawa (1973)
- Highway 403/QEW Interchange and post tension bridge structure (1979)
- Highway 401/410 interchange, one of the highest and longest post-tension fourth level bridge structures in Ontario (1988)
- Dundas Street Bridge at Trenton, Ontario, North America's first multi-span bridge deck constructed and slid into place (1990)
- Highway 400/407 cloverleaf interchange with six post-tension bridge structures (1990)
- Access roads and bridge structures at Terminals 1, 2 and 3 at Lester B. Pearson, Toronto International Airport (1978, 1989 and 2001)
- Ontario's first Total Project Management (TPM) contract to design/build the Queen Elizabeth Way(QEW) in the Niagara Region (1997)
- Highway 416 expansion at west Ottawa (1996)
|
|
- Highway 407 West, part of Ontario's first design build toll highway (2001)
- Eastmain River Tunnel Diversion (Hydro Quebec),Eastmain Quebec (2004)
- Highway 403, High Occupancy Vehicle, at Mississauga (2006)
- Highway 401 expansion and new bridge structures at Oshawa (2010)
- Numerous four laning expansion projects on Highway 69 & Highway 11 through the Muskoka Region (1995 - 2012)
Today, Bot Construction is a full service general contractor with a solid reputation for expertise in its field. It is operated with the same hands-on dedication and commitment to doing all things well that has defined the company since its beginning in 1957.
1 | |
|
|
|