Welcome | Management | Safety/Quality/Environment | Community | News/Events | Industry Memberships | History | Founder's Day | Home  
 
  History of Bot Construction
continued from page 1
 
 

Other examples of the wide range of projects completed by Bot Construction include:

  • Expansion of Highway 417 East Ottawa (1973)
  • Highway 403/QEW Interchange and post tension bridge structure (1979)
  • Highway 401/410 interchange, one of the highest and longest post-tension fourth level bridge structures in Ontario (1988)
  • Dundas Street Bridge at Trenton, Ontario, North America's first multi-span bridge deck constructed and slid into place (1990)
  • Highway 400/407 cloverleaf interchange with six post-tension bridge structures (1990)
  • Access roads and bridge structures at Terminals 1, 2 and 3 at Lester B. Pearson, Toronto International Airport (1978, 1989 and 2001)
  • Ontario's first Total Project Management (TPM) contract to design/build the Queen Elizabeth Way(QEW) in the Niagara Region (1997)
  • Highway 416 expansion at west Ottawa (1996)
 
  • Highway 407 West, part of Ontario's first design build toll highway (2001)
  • Eastmain River Tunnel Diversion (Hydro Quebec),Eastmain Quebec (2004)
  • Highway 403, High Occupancy Vehicle, at Mississauga (2006)
  • Highway 401 expansion and new bridge structures at Oshawa (2010)
  • Numerous four laning expansion projects on Highway 69 & Highway 11 through the Muskoka Region (1995 - 2012)

Today, Bot Construction is a full service general contractor with a solid reputation for expertise in its field. It is operated with the same hands-on dedication and commitment to doing all things well that has defined the company since its beginning in 1957.

1 | 2

 
   
 
   
 
   
 
 
             
             
Proudly building Canada's infrastructure for more than half a century.
CONSTRUCTION: 905-827-4167
AGGREGATES: 1-877-898-2688
MINING: 705-522-9951
 
  © BOT CONSTRUCTION GROUP